Driving an AI-powered future, we use machine learning translation in this website.

Do I need to pre-wet the concrete surface before the testing?

The contact between the pore solution of the concrete and the probe can be impaired by a dried out concrete skin. This can greatly increase the electrical resistivity of the concrete.

It is recommended to moisten the surface approximately 10 to 20 minutes before carrying out the measurement.

See Less